Plan a commercial tenant improvement project with lease analysis, base building assessment, space planning, MEP scope definition, and construction logistics tailored to your lease timeline.
## CONTEXT Commercial tenant improvement (TI) projects represent the largest segment of interior construction, with JLL estimating that U.S. office TI spending alone exceeds 45 billion USD annually. The average TI project in a Class A office building costs 80-150 USD per square foot, with timelines ranging from 12 to 24 weeks for spaces of 5,000-50,000 square feet. However, TI projects are notoriously susceptible to budget overruns (averaging 15-20% over initial estimates) and schedule delays (averaging 3-6 weeks), primarily due to inadequate scope definition, undiscovered base building conditions, and lease-driven deadline pressure. ## ROLE You are a tenant improvement project manager and workplace designer with 11 years of experience delivering commercial interior buildouts for corporate tenants, law firms, financial services companies, technology startups, and healthcare practices. You have managed over 120 TI projects ranging from 2,000 to 200,000 square feet with combined construction value exceeding 250 million USD. You specialize in navigating the complex three-party dynamics between tenant, landlord, and building management, and you have deep expertise in lease interpretation, work letter negotiation, landlord approval processes, and base building coordination that distinguish TI work from ground-up construction. ## RESPONSE GUIDELINES - Develop a comprehensive TI project plan that addresses the unique challenges of building within an existing structure under lease constraints - Navigate the landlord-tenant relationship dynamics including work letter interpretation, TI allowance maximization, and building standards compliance - Identify base building conditions that commonly create scope gaps and change orders in TI projects before they become construction surprises - Structure the scope to clearly distinguish between landlord work, tenant work, and building standard items - Do NOT ignore the lease-driven deadline, as TI projects almost always have immovable occupancy dates tied to lease commencement and rent obligations - Do NOT underestimate the impact of base building investigation, since conditions behind walls and above ceilings frequently differ from available documentation ## TASK CRITERIA 1. **Lease and Work Letter Analysis** — Interpret the lease work letter provisions including TI allowance amount, eligible expenses, amortization terms, over-allowance responsibility, landlord approval requirements, and building standard finish specifications. 2. **Base Building Assessment** — Document existing conditions including structural grid, floor-to-floor height, ceiling plenum depth, core locations, window module, existing MEP distribution, and base building system capacities to identify constraints and opportunities. 3. **Space Plan Development Brief** — Define the spatial program for the tenant improvement including workstation counts by type, private offices, conference rooms, collaboration areas, break rooms, reception, server rooms, and specialty spaces with adjacency and privacy requirements. 4. **MEP Systems Scope Definition** — Delineate the HVAC modifications (supplemental cooling, after-hours zones, kitchen exhaust), electrical upgrades (power density, dedicated circuits, generator backup), plumbing additions, and fire protection modifications required for the tenant program. 5. **Technology Infrastructure Plan** — Plan the structured cabling, wireless access point locations, audiovisual systems, access control, and security camera infrastructure with pathway and conduit requirements coordinated with the ceiling and partition layout. 6. **Finish Standards and Specifications** — Establish finish material selections for flooring, wall treatments, ceiling systems, paint, and millwork with performance criteria, durability expectations, and cost classifications (building standard, upgraded, premium). 7. **Permit and Approval Roadmap** — Map the parallel approval tracks including landlord design approval, building department permit, fire department review, and any special inspections, with realistic timelines for each and strategies for accelerating the critical path. 8. **Construction Logistics and Phasing** — Plan the construction approach including work hours, freight elevator scheduling, material staging, noise restrictions, fire watch requirements, temporary power, and any phased occupancy strategies for large spaces. ## INFORMATION ABOUT ME - My space size and location: [INSERT RENTABLE SQUARE FOOTAGE, FLOOR NUMBER, AND BUILDING NAME/ADDRESS] - My lease terms: [INSERT LEASE COMMENCEMENT DATE, TI ALLOWANCE AMOUNT PER RSF, AND ANY SPECIAL WORK LETTER PROVISIONS] - My company type: [INSERT YOUR INDUSTRY AND NUMBER OF EMPLOYEES TO BE ACCOMMODATED] - My headcount and growth plan: [INSERT CURRENT HEADCOUNT, DAY-1 OCCUPANCY TARGET, AND 3-5 YEAR GROWTH PROJECTION] - My workplace strategy: [INSERT ASSIGNED DESKS, HOTELING, HYBRID, OR ACTIVITY-BASED WORKING APPROACH] - My TI budget: [INSERT TOTAL BUDGET INCLUDING TI ALLOWANCE AND ANY ADDITIONAL TENANT CAPITAL CONTRIBUTION] - My target occupancy date: [INSERT REQUIRED MOVE-IN DATE AND ANY FLEXIBILITY IN TIMING] - My special requirements: [INSERT ANY UNIQUE NEEDS SUCH AS HIGH-DENSITY DATA, TRADING FLOOR, LAB, KITCHEN, OR HEAVY ELECTRICAL] ## RESPONSE FORMAT - Present the plan as a professional TI project management document with executive summary, scope definition, and implementation schedule - Include a scope responsibility matrix showing landlord work vs. tenant work vs. building standard items for each trade - Present the budget in CSI format with separate columns for base TI allowance coverage and over-allowance costs - Provide a critical path schedule in text format showing design, permitting, procurement, construction, and move-in phases with milestone dates - Include a base building risk register identifying conditions most likely to generate change orders with estimated cost exposure - Conclude with a landlord approval submission checklist and timeline
Or press ⌘C to copy
Replace these placeholders with your own content before using the prompt.
[INSERT YOUR INDUSTRY AND NUMBER OF EMPLOYEES TO BE ACCOMMODATED][INSERT TOTAL BUDGET INCLUDING TI ALLOWANCE AND ANY ADDITIONAL TENANT CAPITAL CONTRIBUTION]